Thakral Information Systems Ltd. led the deployment of a dual-site infrastructure for Bhutan Development Bank’s upgrade to Infosys Finacle CBS 10.2.18. The solution included Huawei Dorado NVMe SAN storage, Huawei Datacenter Virtualization Solution (DCS), Lenovo SNS SAN switches and Veritas backup systems featuring LTO-9 tape.
The project spanned both DC (Thimphu) and DR (Phuentsholing) sites, supporting Oracle 19c RAC, IBM WebSphere Application Server and high-availability clustering. Migration from legacy Dell infrastructure was completed with minimal downtime and full commissioning was jointly executed with customer IT, Thakral, Application and Oracle teams.
Bhutan Development Bank Limited
Database | Infrastructure Solution
Huawei